Replacement of the deck floor of the aft platform of a 42′
Want to contact us?
Other completed projects
Antifouling treatment of a Farline 58
Painting of the whole boat and explanation of the process to do it.
Different jobs done on a Benetti
Osmosis treatment of a belliure 52
Pickled and varnished bulwark and outdoor furniture – Apreamare 47
Construction and placement of a hydraulic platform - Primatist 47
50cm bathing platform extension with anti-slip kiwigrip and gray protective profile.
Retractable bow propeller – Jeanneau 46
Restoration of Menorquin 38 bathtub table