Replacement of the deck floor of the aft platform of a 42′
Want to contact us?
Other completed projects
Retractable bow propeller – Jeanneau 46
Osmosis treatment of a Scialino 34
Bulwark wood treatment of a sciallino 34
Painting of the whole boat and explanation of the process to do it.
LAYING SYNTHETIC FLOOR ON A FAIRLINE
Painted hull of a Franchini Emozione 35
Luff/Centre board sinister repair
Construction and placement of a hydraulic platform - Primatist 47
Lengthening of the stern deck of a Cranchi Smeraldo 36' by placing 10mm thick highlighted teak.
