Painting of pardo 38

PAINTING PROCES OF THE PARDO 38

Pardo 38 painting process with AWL Grip Dark Green, T-Top with Super Jet Black and vinyled with Yellow Sahara Sand.

Painting Proces

Sand the entire surface to be painted for proper adhesion.

Putty the possible deformities produced by the fiber

Apply epoxy primer

Cover the whole boat to prevent the entry of paint particles

Spray paint with AWL Grip Dark Green the hull and the inside of the tub and with Super Jet Black the T-Top

Vinyl with Yellow Sahara Sand

RESULTS

Start
End
Start
End

Do you want to get in touch with us?

TECNIYACHT-5, S.L. com a responsable del tractament tractarà les teves dades amb la finalitat de donar resposta a la teva consulta o petició. Pots accedir, rectificar i suprimir les teves dades, així com exercir altres drets consultant la informació addicional i detallada sobre protecció de dades a la nostra Política de Privacitat

REPLACEMENT OF THE ORIGINAL TEAK DECK ON A NORDWIND 47

Construction and placement of a hydraulic platform - Primatist 47

60 cm extension of bath platform with an extensible central part to make the bathtub bigger. All with 10 mm teak plaster accented.

Modification of the platform of a sessa extending 60cm with two chests, plus an integrated bathroom ladder by placing 10mm plaster marked teak.

50cm bathing platform extension with anti-slip kiwigrip and gray protective profile.

Extension of a jupette of about 45 cm with a protective belt, non-slip engraving and bathroom ladder.

Extension aft 1.10 m with two lateral columns, with stowage chests, bathroom ladder and teak placement.

REPLACEMENT OF CARPET BY NATURAL WOOD OF AN ANTAGO 26

Antifouling treatment of a Farline 58

Leave a Reply

Your email address will not be published. Required fields are marked *