Painted the sidelines of a Bavaria 32′
Want to contact us?
Other completed projects
Extension of a jupette of about 45 cm with a protective belt, non-slip engraving and bathroom ladder.
Construction and placement of a hydraulic platform - Primatist 47
Osmosis treatment of a Sunseeker 32
Refit of a Fjord 35
BED CONSTRUCTION WITH MAHOGANY For A SAN LORENZO
Teak change and opening step to the platform - Scialino 30
Lengthening of the stern deck of a Cranchi Smeraldo 36' by placing 10mm thick highlighted teak.
Painted hull of a Four Winns 35
Reform of a 42' stern platform by ripping out all the platform floor in poor condition and building a new floor.