Painted the sidelines of a Bavaria 32′
Want to contact us?
Other completed projects
Construction and placement of a hydraulic platform - Primatist 47
Reform of a 42' stern platform by ripping out all the platform floor in poor condition and building a new floor.
50cm bathing platform extension with anti-slip kiwigrip and gray protective profile.
Luff/Centre board sinister repair
CONSTRUCTION OF CABINETS WITH OAK WOOD for a PARDO 38
Restoration of Menorquin 38 bathtub table
Stripping of a Sessa 32
Antifouling treatment of a Farline 58
Painted and vinylized of the Freestanding ship of a belliure 52
