Painted the sidelines of a Bavaria 32′
Want to contact us?
Other completed projects
VENEERED WITH OAK AND VARNISHED FLOOR IN A PARDO 38
LAYING SYNTHETIC FLOOR ON A FAIRLINE
Retractable bow propeller – Jeanneau 46
Exterior Refit of a North Wind 47
Painted hull of a Comet 44
Stripping of a Sessa 32
Tube propeller - Bavaria 44
60 cm extension of bath platform with an extensible central part to make the bathtub bigger. All with 10 mm teak plaster accented.
Pickled and varnished bulwark and outdoor furniture – Apreamare 47
