Painting of pardo 38
PAINTING PROCES OF THE PARDO 38
Pardo 38 painting process with AWL Grip Dark Green, T-Top with Super Jet Black and vinyled with Yellow Sahara Sand.
Painting Proces
Sand the entire surface to be painted for proper adhesion.
Putty the possible deformities produced by the fiber
Apply epoxy primer
Cover the whole boat to prevent the entry of paint particles
Spray paint with AWL Grip Dark Green the hull and the inside of the tub and with Super Jet Black the T-Top
Vinyl with Yellow Sahara Sand
RESULTS
Start
End
Start
End
Do you want to get in touch with us?
Extension 60 cm bathing platform of a Menorquin 120.
CONSTRUCTION OF CABINETS WITH OAK WOOD for a PARDO 38
Modification of the platform of a sessa extending 60cm with two chests, plus an integrated bathroom ladder by placing 10mm plaster marked teak.
Painted hull of a Franchini Emozione 35
Antifouling treatment of a Farline 58
Construction and placement of a hydraulic platform - Primatist 47
60 cm extension of bath platform with an extensible central part to make the bathtub bigger. All with 10 mm teak plaster accented.
Bulwark wood treatment of a sciallino 34
Fire accident Astondoa 72
