Painting of pardo 38
PAINTING PROCES OF THE PARDO 38
Pardo 38 painting process with AWL Grip Dark Green, T-Top with Super Jet Black and vinyled with Yellow Sahara Sand.
Painting Proces
Sand the entire surface to be painted for proper adhesion.
Putty the possible deformities produced by the fiber
Apply epoxy primer
Cover the whole boat to prevent the entry of paint particles
Spray paint with AWL Grip Dark Green the hull and the inside of the tub and with Super Jet Black the T-Top
Vinyl with Yellow Sahara Sand
RESULTS
Start
End
Start
End
Do you want to get in touch with us?
REPLACEMENT OF CARPET BY NATURAL FLOOR OF AN ANTAGO 26
Antifouling treatment of a Farline 58
Teak change and opening step to the platform - Scialino 30
Teak cover replacement - Bavaria 46
VENEERED WITH OAK AND VARNISHED FLOOR IN A PARDO 38
Exterior Refit of a North Wind 47
50cm bathing platform extension with anti-slip kiwigrip and gray protective profile.
Pickled and varnished bulwark and outdoor furniture – Apreamare 47
Retractable bow propeller – Jeanneau 46
