Fire accident Astondoa 72
Fire accident Astondoa 72:
- Sanitize and reinforce burned areas of the dead work
- Sanitized and putty of the deck, solarium and cabin side
- Placement of teak in the regala
- Reconstruction of the side door of the kitchen
- Completely disassemble and rebuild the captain’s cabin:
- Cleaned, degreased and completely painted inside
- Upholstered partitions and ceilings
- Lacquered doors and cabinets
- Tile bathroom partitions
- Floor change bathroom area
- Replacement of lights
- Change faucets and accessories
- New mattresses and pillows
- TV installation
- Polished all stainless
- Replacement of all the boat’s teak
- Replace the interior carpet
- Making Fly covers and seats, as well as a new dashboard and seat
- Construction and varnishing of the floor inside the wheelhouse with cherry wood plus wenge
- Dismantling, sanding, plastering with root wood and varnishing nautical charts and steering wheel
- Painted dead work and superstructure
- Installation of front and side safety glass in the cabin with stainless steel frames
- Stripped and painted antifouling
Want to contact us?
Other realized projects
Exterior Refit of a North Wind 47
Refit Cranchi endurance
Refit of a Fjord 35