Painted the sidelines of a Bavaria 32′
Want to contact us?
Other completed projects
Renovation of the stern of a Princess 40
Bulwark wood treatment of a sciallino 34
REPLACEMENT OF THE ORIGINAL TEAK DECK ON A NORDWIND 47
Lengthening of the stern deck of a Cranchi Smeraldo 36' by placing 10mm thick highlighted teak.
Modification of the platform of a sessa extending 60cm with two chests, plus an integrated bathroom ladder by placing 10mm plaster marked teak.
Tube propeller - Bavaria 44
Refit Cranchi endurance
Painted hull of a Comet 44
REPLACEMENT OF CARPET BY NATURAL FLOOR OF AN ANTAGO 26